CUG-end

Please log any faults identified separately to this checkist at Universal Hotels – Fault reporting

Turn on work ights at end of event
Turn off sound system at APS
Check DJ gear for any spills and clean up – then cover the DJ gear
Turn off lighting power at keyswitch
Shut down vision PC and power off LCD TV
Shut down LX and Laser PCs at ops
Check LCD screen for any damage
Shut down Hazer and aircon
Retrieve microphone(s) and test before storing
Amp room tidied – cabled rolled and put away
Log any faults